DCP 183 Working Group

DCP 183 Working Group

  • Status Ceased
  • Parent Change Proposal 183 - To Convert the super red KWH to KVA when calculating the EDCM tariffs
  • Summary Of Purpose

    The current EDCM process uses kVA (capacity) to determine the allocation of 20% scaling plus indirect costs, and notional assets at the level of connection of a customer and kWh (super red demand) to determine the allocation of 20% scaling plus indirect costs, and notional assets upstream of the level of connection of a customer.

    The intent of this change proposal is to use super red reactive power and apply this to the super red demand to turn kWh to kVA.||The current EDCM process uses kVA (capacity) to determine the allocation of 20% scaling plus indirect costs, and notional assets at the level of connection of a customer and kWh (super red demand) to determine the allocation of 20% scaling plus indirect costs, and notional assets upstream of the level of connection of a customer. The intent of this change proposal is to use super red reactive power and apply this to the super red demand to turn kWh to kVA.||