DCP319 - Removal of residual charging for embedded generators in the CDCM||The intent of this change proposal is to amend the application of residual charging in respect of embedded generators.||On Tuesday, 09 October 2018, Ofgem issued a letter to the Proposer of DCPs 319 and 321, which detailed their concerns with respect to the scope of the proposals overlapping with the Targeted Charging Review (TCR) Significant Code Review (SCR). Specifically, that the inclusion of generation in the intent of the CPs may result in Ofgem not approving the CPs or directing that the CPs be treated as falling within scope of the SCR, thus being rejected.
In accordance with Clause 11.29, on 12 October 2018, the Proposer notified the Secretariat of their wish to withdraw their support for DCP 319 and DCP 321. The Proposer noted that this is in light of the letter received from Ofgem earlier that week.
Although, there was the option for another Party to support the development of the CPs, where the intent of each CP would have been amended to resolve the overlap described above, no Parties came forward in the 10 Working Days provided and as such the CP has been withdrawn.