Generation credits in the EDCM

Standard Withdrawn

DCP-287

Generation credits in the EDCM

DCP 287 - Generation credits in the EDCM

The intent of this Change Proposal is to amend the calculation of credits for embedded generation in the EDCM to take account of potential cost savings for DNOs that can be attributed to embedded generation in the areas of transmission exit charges, direct costs, indirect costs and network rates.

DCP 287 was withdrawn following discussions with both the Code Administrator and the Authority (Ofgem). The Proposer expects that recognition of the further network benefits of EHV-connected generation will be explicitly addressed through the Access and Forward-looking Significant Code Review. If they are not, then the Proposer will look to re-start this CP.