DCP-401
Consequential DCUSA changes for Switching SCR (REC 3.0)
Ofgem’s Switching Significant Code Review (SCR) will introduce the new Central Switching Service (CSS) and version 3.0 of the Retail Energy Code (REC 3.0). This Change Proposal progresses the consequential DCUSA changes needed to align with REC 3.0.
- Section 1.a - Preliminary
- Section 1.b - Governance
- Section 1.c - Change Control
- Section 2.a - Distributor To Supplier/generator Relationships
- Section 3: General Legal Provisions
- Schedule 1: Cover
- Schedule 8: Demand Control
- Schedule 16: Common Distribution Charging Methodology
- Schedule 32: Residual Charging Bands
- Schedule 33: Disconnections
- Section 1A: Clause 1 ‘Definitions and Interpretation’
- Section 1B: Clause 8 ‘Costs of the DCUSA’
- Section 1C: Clause 12 ‘Voting’
- Section 2A:
- Clause 25 ‘Energisation, De-Energisation And Re-Energisation’
- Clause 30 ‘Provision Of Information’
- Section 3: Clause 54 ‘Termination’
- Schedule 1 ‘Cover’
- Schedule 8 ‘Demand Control’
- Schedule 16 ‘Common Distribution Charging Methodology’
- Schedule 32 ‘Residual Charging Bands’
- Schedule 33: ‘Disconnections’